Rehabilitation of the sewer network: Rumenacka street – GC2, Kisacka street

PROJECT DESCRIPITON

Construction and reconstruction of the primary sewage network from Rumenicka Street to the main pumping station GC2 in Novi Sad.

WORKS DESCRIPTION

 -  Ductile pipe installation:

  • Ø 1600 mm, L=324.64m
  • Ø 1400 mm, L=1747.34m
  • Ø 1200 mm, L=340.99m
  • Ø 1000 mm, L=265.65m
  • Ø   800 mm, L=471.28m
  • Ø   600 mm, L=250.72m

Overall length of 3,400.62 m ';

  • 62 reinforced concrete inspection chamber;
  • UPVC pipe connections totaling 1682.17 m ';
  • 144 storm sewers;
  •  ...

LOCATION:  

Novi Sad, Serbia

INVESTOR: 

Public Utility Company ’’Vodovod i kanalizacija’’ Novi Sad

TYPE OF THE PROJECT:

RED FIDIC

CONTRACT VALUE:

2.643.722,44 EUR

EXPECTED COMPLETION OF WORKS:

04/2013 – 10/2014