WORKS DESCRIPTION
Remediation and closure of tailings and slag landfill included the execution of the following works:
- removal of tailings and slag from the western part of the landfill to the eastern part of the landfill;
- arrangement and closure of the eastern part of the landfill;
- arrangement and closure of the western part of the landfill;
- removal of leachate water;
- protection of the landfill from atmospheric precipitation;
- reclamation of closed landfill.
The landfill was closed as follows:
- Earth filling of bottom;
- Installation of waterproof HDPE foil:
- Geotextile (1200 gr / m2) below HDPE foil;
- HDPE foil;
- Geotextile (400 gr / m2) above HDPE foil;
- placement a layer of gravel;
- Reclamation:
- spreading a layer of earth;
- spreading a layer of humus.
Quantities:
-
Excavation (of various materials): 117,763 m3.
-
Backfill (various materials): 109,896 m3.
-
Placement of clay material: 19.281 m3.
-
Placement of crushed stone in cement mortar: 3.901 m3.
-
Placement of HDPE foil: 44.448 m2.
-
Placement of geotextile 1200 (gr / m2): 42,427 m2.
-
Placement of geotextile 400 (gr / m2): 42,427 m2.
-
Re-soiling and grassing of surfaces: 31,662 m2.
LOCATION:
Zajaca, Serbia
CONTRACT VALUE:
221.999.999,60 RSD
(1.881.355 EUR)
EXPECTED COMPLETION OF WORKS:
April 2016. – November 2017.