Construction of the missing street sewer network in Kula and Crvenka and construction of the Crvenka-Kula transit pressure network and its associated facilities

PROJECT DESCRIPITON

The aim of the project is to solve the pollution problem of the Grand Backa Canal by building a sewerage network and connecting wastewater to the regional sewerage and treatment system of Vrbas and Kula.

WORKS DESCRIPTION

  • Construction, testing and commissioning of a sewerage network in the length of 42,500.00m from PVC pipes Ø200 - 400mm with 8 new pumping stations with associated pressure network and reconstruction of two old pumping stations;

  • Construction, testing and commissioning of a 31,500mm PEHD 315mm transit pressure network pipeline;

  • Construction of the Central Plant for Mechanical Treatment, Collection and Distribution of Waste Water via Transit Pipeline to the Waste Water Treatment Plant in Vrbas Wastewater in Crvenka.

LOCATION:

Kula – Crvenka, Municipality of Kula, Serbia

INVESTOR:

Municipality of Kula

CONTRACT VALUE:

522.116.038,02 RSD 

(4.350.966,83 EUR)

EXPECTED COMPLETION OF WORKS:

April, 2019.