Construction of Water Treatment Plant Subotica II and Auxiliary Works

PROJECT DESCRIPTION

Tender Reference: SWUP III (Subotica Water Upgrade Project III)

Project Number: 7742-IFT-43472

Contract Signing Date: August 17, 2017

Commencement Date: October 23, 2017

Time for Completion: 880 days

Defects Notification Period: 365 days

WORKS DESCRIPTION

Construction of WTP consist of folowing:

- Rehabilitation of existing wells by delivery of new well pumps

- Design and construction of one or more de-sanding units to catch the sand from the wells and pre-ozonization

-  Design and construction of one water treatment plant building for a design capacity of 160 l/s and construction of first stage treatment capacity of 80 l/s/s

- Design review/adaptation and construction of a clear water tank of 2,500 m³

- Design review/adaptation and construction of a high pressure pumping station for 200 l/s for a maximum pressure of 6.0 bars

- Design and construction of sludge treatment line with sludge thickening and dewatering, and supernatant re-use

- Delivery and installation of an atomic absorption spectrophotometer AA-7000/AAC unit with graphite flame hybrid technique and auto sampler with auto atomizer changer with wavelenght range: 180.0 to 900.0 nm, vehicles and other auxiliary works

LOCATION:

Subotica, Serbia

INVESTOR:

JPUC Waterworks and Sewerage Subotica

TYPE OF THE PROJECT:

Conditions of Contract for Plant and Design-Build (FIDIC Yellow Book)

CONTRACT VALUE:

5.550.075,79 €

EXPECTED COMPLETION OF WORKS:

March 2020.