Design and built of One Package-Container Plant for Treatment of sanitary Wastewaters for 200 PE and Supply the leachate treatment plant for residual leachate all according to the Construction of the Regional Waste Management Centre for Subotica District

PROJECT DESCRIPTION

According to the Construction of the Regional Waste Management Centre for Subotica District projected task was to design and build a water treatment plant with a landfill and waste water treatment plant treated in the MBT plant and waste water from administrative buildings and other facilities.

WORKS DESCRIPTION

Waste Water Treatment Plant of sanitary wastewaters is design as One Package-Container Plant with capacity of 30 m3/day, based on SBR technology.

The leachate treatment plant for residual leachate from the landfill has treatment capacity of 4,50 m3/h of aerated leachate, based on the Reverse Osmosis (RO) technology.

Both plants are fully automated and the result of their treatment is water in accordance with all applicable standards that can be released into the river recipient.

LOCATION:

Subotica, Serbia

INVESTOR:

IBI s.p.a (as Lead Contractor according to the Construction of the Regional Waste Management Centre for Subotica District Subotica)

TYPE OF THE PROJECT:

YELLOW FIDIC

CONTRACT VALUE:

610.000 €

EXPECTED COMPLETION OF WORKS:

2016. - 2017.