Remediation, closure and recultivation of Slag Landfil from the Smelter in ‘’Zajaca’’

WORKS DESCRIPTION

Remediation and closure of tailings and slag landfill included the execution of the following works:

  • removal of tailings and slag from the western part of the landfill to the eastern part of the landfill;
  • arrangement and closure of the eastern part of the landfill;
  • arrangement and closure of the western part of the landfill;
  • removal of leachate water;
  • protection of the landfill from atmospheric precipitation;
  • reclamation of closed landfill.

The landfill was closed as follows:

  • Earth filling of bottom;
  • Installation of waterproof HDPE foil:
    • Geotextile (1200 gr / m2) below HDPE foil;
    • HDPE foil;
    • Geotextile (400 gr / m2) above HDPE foil;
  • placement a layer of gravel;
  • Reclamation:
    • spreading a layer of earth;
    • spreading a layer of humus.

Quantities:

  • Excavation (of various materials): 117,763 m3.

  • Backfill (various materials): 109,896 m3.

  • Placement of clay material: 19.281 m3.

  • Placement of crushed stone in cement mortar: 3.901 m3.

  • Placement of HDPE foil: 44.448 m2.

  • Placement of geotextile 1200 (gr / m2): 42,427 m2.

  • Placement of geotextile 400 (gr / m2): 42,427 m2.

  • Re-soiling and grassing of surfaces: 31,662 m2.

LOCATION:

Zajaca, Serbia

CONTRACT VALUE:

221.999.999,60 RSD

(1.881.355 EUR)

EXPECTED COMPLETION OF WORKS:

April 2016. – November 2017.